E ISSN 1987 - 8257

Atshesi HPP Печать E-mail
28.01.2010 10:57

Atshesi is a hydro power plant of seasonal regulation. It is located in Adjara, in 30 km from Batumi, on the river Adjaristskali. Its installed capacity is 16 MW. Annual capacity of the HPP is 85 man. kW/h.

 

Atshesi was put into operation in 1941.

 

The Hydro Power Plant is in a private possession at present.  

Обновлено 28.01.2010 11:11
 
© 2024 EnergyOnline. Все права защищены.